What's included
- Base checked for level and strength
- Tank placed and positioned
- Inlet, outlet and overflow connectors fitted
- Joins made to your existing pipes
- Float valve fitted and set
- Fill and leak test, plus 30-day warranty
What's not included
- The tank, connectors and float valve, bought by you
- Building a base or platform
- Old tank removal and long pipe runs, quoted first
How the visit goes
- 1
Check the base
The plumber checks the platform is level and suits the tank's size.
- 2
Place the tank
The tank is set in position with its outlets facing the existing pipes.
- 3
Fit the connections
Holes are cut where needed, connectors are fitted and joined to the lines.
- 4
Fill and test
The motor fills the tank, the float is set and every joint is checked.
What we need from you
- The tank and its connectors and float valve
- The tank carried to the roof or a clear path for it
- Safe roof access
Questions about this service
Will you carry the tank up to the roof?
Mention it while booking. Carrying a large tank up several floors may need extra hands and is agreed first.
Can you remove my old tank?
Yes, as extra work priced and agreed before starting.
Which connectors should I buy?
An inlet, outlet and overflow connector to suit your pipe size, plus a float valve. The plumber can confirm before you buy.
Reviews
No reviews yet. Be the first to book and review this service.